Licensed Permitting & EPC Partner for Charging Stations in Indonesia

Permitting & Construction for EV Charging Stations

A legally established execution partner that accelerates your Charging Stations (public EV charging & battery-swap stations) from paperwork to operating sites — fast, measurable, and fully compliant.

01About Us

PT Panca Loka Artha Nusantara — Bandung, West Java.

A licensed company for permitting & building charging infrastructure.

PT Panca Loka Artha Nusantara (PT PLAN) is an Indonesian limited liability company focused on the two things that determine charging rollout speed: handling permits and building stations.

We master the official process of obtaining charging station Identity Numbers following the regulatory process of the Directorate General of Electricity, Ministry of Energy and Mineral Resources (MEMR), and our licenses directly cover electrical operation & construction.

What drives us

A charging unit only earns once its permit is issued. Our job is to close that gap, site after site.

02Industry Context

Why permitting, not hardware, sets the pace of a charging rollout.

Charging units don't earn until their permits are issued.

For charging operators, the biggest bottleneck isn't the hardware — it's the time and complexity of permitting. Every day of delay is deferred revenue.

2.1

Lengthy process

Obtaining an Identity Number per unit involves extensive documents, data entry, and inter-agency coordination.

2.2

Hard to scale

Rolling out dozens to hundreds of sites demands consistent submission capacity, not one-by-one handling.

2.3

Compliance risk

Document errors in the regulatory process mean rework, rejections, and delayed operations.

Our Role

We absorb the permitting and construction burden, so operators can focus on growing their network and revenue.

03Our Services

Two service lines, one clear workflow, and flexible ways to engage.

Two pillars, one goal: get your stations operating sooner.

Pillar 01 · Permitting01

Charging Station Permitting

Identity Numbers for your charging stations, handled in line with prevailing regulations.

  1. Obtaining Identity Numbers following the regulatory process of the Directorate General of Electricity, MEMR
  2. Reviewing & compiling required documents and data
  3. Submission and agency coordination, through to approval
  4. Regular, transparent progress reporting
Pillar 02 · EPC02

Station Construction

Engineering, procurement and construction, from site survey to a commissioned station.

  1. Site survey, technical & electrical station design
  2. Equipment procurement & power-connection coordination (PLN)
  3. Construction and installation, through to commissioning
  4. Backed by electrical-construction licenses
Permitting+EPC=End-to-endfrom paperwork to a live station — or engage each separately
How permitting works

A Proven Workflow, with Clear Time Commitments

Five steps per Identity Number, each one visible to you through regular reporting.

  1. Step 01

    Verify

    Check document & data completeness for each unit and site.

  2. Step 02

    Compile

    Prepare & input documents to the applicable regulatory standards.

  3. Step 03

    Submit

    Official submission following the Directorate General of Electricity, KESDM process.

  4. Step 04

    Coordinate

    Active communication with agencies until approved.

  5. Step 05

    Issued

    Identity Number issued & reported to the client.

Engagement models

Choose the scope that fits your rollout.

Start with one model and extend as your network grows.

  • A
    Option A

    Permitting only

    Hand over charging station Identity Number processing to PT PLAN, so units become legal & operational faster.

    Discuss
  • B
    Option B

    Permits + Build (EPC)

    An end-to-end package: from permitting to installed, ready-to-run stations at every site.

    Discuss
  • C
    Option C

    Scaled rollout partner

    Sustained submission capacity for multi-site expansion, with a steady reporting cadence.

    Discuss

The bottom line: every site whose permit is issued sooner is revenue switched on sooner.

04Why Us

What sets us apart

Four reasons operators work with us.

Fast & measurable

Clear per-unit SLAs and capacity for scaled rollout — not one-off handling.

Transparent

Regular progress reports, so you know the status of every site without chasing.

Compliance-first

Every submission is prepared in line with prevailing regulations, reducing the risk of rejection and rework.

One roof: permits + build

From paperwork to an operating station with one accountable partner — fewer points of failure.

05Next step

Let's start with your first site.

Tell us about your permitting & construction needs, and we'll put together a site-by-site execution plan.

To get started, share with us
  • 01Site locations & number of charging units
  • 02Target go-live timeline
  • 03Scope: permitting, EPC, or both